
190
Using ProLink
®
Software with Micro Motion
®
Transmitters
Flowmeter Calibration Records
continued
Model RFT9739 Calibration Record
Date _________________________
Auto Zero (Chapter 14)
Convergence limit_______________ Zero time_______________
Density Calibration (Chapter 14)
First Point (Air)
Line-condition density__________ g/cc
Second Point (Water)
Line-condition density__________ g/cc
Third Point
Line-condition density__________ g/cc
Viscosity Calibration (Chapter 14)
Slope calibration
Line-condition viscosity_______________
Offset calibration
Line-condition viscosity_______________
Temperature Calibration (Chapter 14)
Slope Calibration
Measured temperature___________ °C
Offset Calibration
Measured temperature___________ °C
Milliamp Output Trim (Chapter 14)
Milliamp Output 1
Reference current at ±4 mA________ mA
Reference current at ±20 mA________ mA
Milliamp Output 2
Reference current at ±4 mA________ mA
Reference current at ±20 mA________ mA
Komentáře k této Příručce